GSTIN: 27AAKFA5219M1Z6 ISO 9001:2008
Home / Case Studies & Projects

Proven Industrial Track Record

Real installations engineered across municipal water supplies, multi-megawatt utility solar developments, bulk drug chemical facilities, and industrial manufacturing plants.

BARC Spin-off Desalination & Microbial Ultrafiltration Water Purification Capacity: 50,000 LPD Community System
Client: Bhabha Atomic Research Centre / Municipal Corp Year: 2015-Present

BARC Spin-off Desalination & Microbial Ultrafiltration

Commercialization and execution of BARC licensed membrane technology for bacteria and turbidity-free potable water dispensing.

Key Engineering Milestones:
  • 0.01 Micron absolute cutoff
  • Zero electricity gravity-assisted options
  • 100% bacterial removal
28 MW Utility-Scale Grid Solar Power Project Solar Energy Capacity: 28 Megawatts (MW)
Client: PVV Infra Limited & State Discom Year: 2025-Ongoing

28 MW Utility-Scale Grid Solar Power Project

Turnkey land procurement, structural mounting fabrication, inverter stations, and 33kV switchyard evacuation infrastructure.

Key Engineering Milestones:
  • 28 MW Cumulative Capacity
  • Hot-dip galvanized heavy GI structures
  • Estimated 42 million units annually
Pharmaceutical High-Purity SS 316L Reactor & Storage Silo Skid SS Fabrication Capacity: 10,000 Litres Jacketed Reactor
Client: Leading Regional Chemical & Pharma Unit Year: 2023

Pharmaceutical High-Purity SS 316L Reactor & Storage Silo Skid

Design and fabrication of mirror-finish electro-polished SS 316L reaction vessel with limpet coils and magnetic agitation for sterile synthesis.

Key Engineering Milestones:
  • Complies with ASME Section VIII
  • 0.3 Ra sanitary finish
  • Full vacuum to 8 kg/cm2 design
100 KLD MBBR Industrial Sewage & Wastewater Recycling Plant Water Purification Capacity: 100 KLD (100,000 Litres/Day)
Client: Commercial Township & Industrial Complex Year: 2024

100 KLD MBBR Industrial Sewage & Wastewater Recycling Plant

Modular containerized MBBR wastewater treatment system reducing BOD < 10 ppm, COD < 50 ppm, enabling 100% landscape reuse.

Key Engineering Milestones:
  • MPCB/CPCB discharge compliant
  • Automated PLC control panel
  • Low sludge yield
Turnkey Multi-Specialty Hospital Ward & ICU Outfitting Hospital Furniture Capacity: 120-Bed Complete Hospital Outfitting
Client: District Medical Trust & Multi-Specialty Hospital Year: 2024

Turnkey Multi-Specialty Hospital Ward & ICU Outfitting

Fabrication, supply, and ward installation of 120 hospital beds (including 20 ICU motorized 5-function beds and 100 semi-fowler beds), complete stainless steel emergency crash carts, examination tables, and instrument cabinets adhering strictly to NABH infection control guidelines.

Key Engineering Milestones:
  • 120 Hospital Beds Supplied & Installed
  • 100% Medical Grade SS 304 & Anti-Bacterial Epoxy Powder Coated
  • Zero Breakdown Reported with 2-Year AMC Warranty
Fast Response Guaranteed

Need a Custom Engineering Quotation?

Submit your contact number or email. Our technical engineering team in Malkapur will contact you within 2 working hours with technical specs and estimates.